Bar GMT2948 Standard Lawn Mower Replacement Parts Fits AERATOR 1000 Deere
Product Details:
Place of Origin: | China |
Brand Name: | Green Guardian |
Certification: | ISO9001:2015 |
Model Number: | MT2948 |
Payment & Shipping Terms:
Minimum Order Quantity: | 5 |
---|---|
Price: | Negotiable |
Packaging Details: | Coated with anticorrosive oil, packed in carton box |
Delivery Time: | 1-7 |
Payment Terms: | L/C, D/A, D/P, T/T, Western Union, m |
Supply Ability: | 200 |
Detail Information |
|||
Product Name: | Bar GMT2948 | Place Of Origin: | Guangdong, China |
---|---|---|---|
Type: | Standard | Size: | Standard |
Material: | Steel | Package: | Carton Box |
Highlight: | Deer Lawn Mower Replacement Parts,Lawn Mower Bar Replacement Parts,Bar GMT2948 |
Product Description
Bar GMT2948 Standard Lawn Mower Replacement Parts Fits AERATOR 1000 Deere
Description
Minimum Order Quantity (MOQ) | 1 piece |
Production Capacity | 100 pieces per week |
Lead Time | 7-20 days from deposit |
Payment Term | T/T, Paypal, Western Union, Cash |
Quality control | Hardness tester, Callipers, Alitimeter, CMM, Projector, 2.5D |
Machines/equipment | CNC lathes, OD Grinder, EDM, CNC Milling |
Other Service | OEM &OEM, Customized Specification, One to One Communication, Free Samples |
Additional | 1) Sample Order and Small Order are acceptable; 2) The methods of delivery: DHL,EMS,UPS or Fedex (fast and safer) 3) Located in manufacturing base of china-dongguan city,we also help customer design according to customers' requirements and products' application. |
Fits Models
Johndeere AERATOR 1000 Deere
Our Advantages
A: Your inquiry related to our products or prices will be replied in 24 hours.
B: Protection of your sales area, ideas of design and all your private information.
C: Best quality and competitive price.
1. Sample check;
2. Before production, mould and model check;
3. Technicians self check in production;
4. Engineer spot check;
5. Packing check;
6. Check before shipping.
For stock items, the min lead time is 2 -3 working days after getting full payment from customers;
For OEM parts, normal lead time is from 2 weeks to 1.5 months, based on different design;
Q2. Shipping method?
We have established long term relationship with many different logistic company, so customer could choose fast express such as
DHL, EMS, FEDEX, UPS, ARAMEX or standard small parcel like Epacket, China Registered Small Parcel, Russian air and so on;
Q3. Payment method?
ALIBABA PAY
Q4. Packing?
We use different packing method, such as PP bag, carton box, wooden box, steel rack, pallet, and also other packing method defined
by customers;
Q5. Aftersales service.
Normally we will give feedback to our customer within 48 hours if there are any problems;