DS Right Threaded Tie Rod End Electric Golf Cart Parts G7539
Product Details:
Place of Origin: | China |
Brand Name: | Greenguards |
Certification: | ISO9001:2015 |
Model Number: | 7539 |
Payment & Shipping Terms:
Minimum Order Quantity: | 5 |
---|---|
Price: | Negotiable |
Packaging Details: | Coated with anticorrosive oil, packed in carton box |
Delivery Time: | 1-7 |
Payment Terms: | L/C, D/A, D/P, T/T, Western Union, m |
Supply Ability: | 200 |
Detail Information |
|||
Product Name: | Golf Cart DS Right-Threaded Tie Rod End | Part Number: | G7539 |
---|---|---|---|
Type: | Fit For Electric Golf Cart | Color: | Metal |
Material: | Steel | Place Of Origin: | Guangdong, China |
Highlight: | DS Right Threaded Tie Rod End,Golf Cart Threaded Tie Rod End,Electric Golf Cart Parts |
Product Description
DS Right Threaded Tie Rod End Electric Golf Cart Parts G7539
Description
Minimum Order Quantity (MOQ) | 1 piece |
Production Capacity | 1000 pieces per week |
Lead Time | 1-20 days from deposit |
Payment Term | T/T, Paypal, Western Union, Cash |
Quality control | Hardness tester, Callipers, Alitimeter, CMM, Projector, 2.5D |
Machines/equipment | CNC lathes, OD Grinder, EDM, CNC Milling |
Other Service | OEM &OEM, Customized Specification, One to One Communication, Free Samples |
Additional | 1) Sample Order and Small Order are acceptable; 2) The methods of delivery: DHL,EMS,UPS or Fedex (fast and safer) 3) Located in manufacturing base of china-dongguan city,we also help customer design according to customers' requirements and products' application. |
Passenger side rie rod end, (right thread). For Club Car G&E 1976-up DS
- Tie rod end ball joint kit for Club Car DS 1976-2008 electric golf cart
Replaces OEM# 7540, left-hand thread driver side ball joint
Replaces OEM# 7539, right-hand thread passenger side ball joint
Allows your steering and suspension the ability to perform properly.
FAQ
Q1.What is your main products?
A1:Our main products are lawnmower parts and golf cart parts.
Q2. How to ensure that every process's quality
A2:Every process will be checked by our quality inspection department which insures every product's quality. In the production of products, we will personally go to the factory to check the quality of products.
Q3.How long is your delivery time?
A3:Our delivery time is generally 1 to 25 days. Or according to the quantity.
Q4. What is your payment method?
A4:30% value of T/T in advance and other 70% balance on B/L copy.
For small order less than1000USD, would suggest you pay 100% in advance to reduce the bank charges.